Additive Manufacturing in Construction
AMC TRR 277

Networking of the Research Projects

Networking within the TRR 277 using the example of A 01

Central to the networking of projects within TRR 277 are physical demonstration objects with assigned digital twins, enlarging the scale during the funding period from test specimens over case study demonstrators to 1:1 final demonstrators. Each project of focus areas B and C is linked to the digital/real demonstrators of at least one A project. In addition, there are material- or process-specific links between the projects of focus area A. In each demonstrator, the specific strengths of the material–process combinations investigated are materialised.

Networking between the AMC Projects

Clips

Playing with Blocks. Duration: 2:15 min

ILF Slab. Duration: 2:43 min

Marriage of two materials. Duration: 2:23 min

I3DCP Bridge. Duration: 2:03 min

Tensegrity Tower. Duration: 1:59 min

Knitcrete Bridge. Duration: 2:08 min

Shelltonics. Duration: 2:17 min

Breuer X Am. Duration: 2:30 min

Bridge the Gap. Duration: 3:06 min

WordPress Lightbox